Papieri Site Cham

On the Papieri site in Cham, the fire department communication solution from Motcom develops with each construction phase – including measurement, installation, acceptance, maintenance, and adjustments.

Project Overview

ClientCham Group AG (Client for the Papieri Site)
IndustryReal Estate and Site Development
Location6330 Cham, Canton of Zug
ObjectConversion of the historical paper factory site into a mixed residential and commercial district, new buildings and existing structures, underground garages, phased implementation
Service AreaFire Department Radio (Turicum)
Scope of ServicesConcept, measurement, adaptive installation per construction phase, acceptance tests, maintenance and adjustments

Initial Situation

The historical Papieri site in Cham is gradually being transformed into a modern residential and commercial district. There was no continuous radio coverage for the fire department in the underground areas, staircases, and new buildings. Since the site is being developed in several phases, the radio solution needed to evolve alongside the construction progress—without disrupting the operation of already occupied building sections.

Client Requirements

  • Continuous fire department radio coverage in basements, staircases, and new buildings
  • Growing, adaptive solution throughout all construction phases
  • Close coordination with the general contractor, Cham fire department, and client
  • Implementation without operational interruption in already occupied areas
  • Regular maintenance and adjustments during the ongoing site development

Solution by Motcom

Motcom realized an adaptive fire department radio solution that evolves in parallel with construction progress. Through a central head station and a gradually expanded distribution network, the BOS signal is routed to all objects. Fire department operation panels enable the emergency services to control the system directly on-site. Implementation occurs in close coordination with the general contractor, the Cham fire department, and the client—without any operational interruptions.

Analysis and Measurement
Phased current measurement and radio coverage check per construction section
Planning and Engineering
Growing network concept, tower and antenna planning, interface with the fire department
Realization
Adaptive installation per construction phase, cabling, and commissioning during ongoing operations
Acceptance
Acceptance measurement and protocol per phase, handover to the Cham fire department
Operation
Maintenance contract with regular checks and adjustments during further expansion

Client Testimonial

Motcom has created a radio solution for us that works reliably and flexibly grows with the area. This ensures that the fire department is safely supplied in every expansion phase.

Gregor Isler, Head of Site Operations & Energy, Cham Swiss Properties AG

Zurück zu Referenzen